Modular Steel Kit Homes

Process

our process imageThe Process

Select a Design you like - this can then be quoted individually to suit site design windload and delivery.

Do you require a floor system? Timber flooring / decking material at extra cost - to be purchased by them from a local supplier (like Bunnings)

Do you want awnings to the side/s or end of house? Size 2.4m or 3m.

Will you require full elevation drawings and plans with Engineering Certification and Bers Thermal Energy report for Council Building Approval as a Class 1 habitable dwelling?

Submit request to office via Email for quoting.


timing imageTiming

When yes to above it will usually take up to three or four weeks for issuing of all plans and paperwork for building approval after placing your order.

If you plan to build on a slab you will need to arrange a Soils test and subsequent slab design to suit soils type as determined from the test. This will be an additional cost.

A site plan needs to be drawn showing block dimensions, house site and contours of land with any cut or fill information.

You will also need plumbing and water treatment plans and electrical plans.

So armed with all the relevant papers you need to make a building application to the local body. Most will issue you with an information package and checklist to follow.


If our quote is acceptable, you can later select

  • Roof type - Corrogated or Trimdeck
  • Roof colour - from Bluescope Colorbond range
  • Wall colour - if Bluescope Colorbond horizontal
  • Raingoods colour - gutter as Quad or Square type
  • Downpipes as PVC or 100 * 75 Colorbond

Note: Internal walls are included in our quote as shown on plans - but fit out materials are extra and not quoted.
This means plumbing, electrical, kitchens, bathrooms, Gyprock lining to ceiling or walls, internal timber doors etc.

Lead time for most ranges is four weeks from payment for supply from suppliers. That is, house frame and trusses to site with insulation, windows and roofing.

Warranties

50 years warranty bluescopeYes up to 50 years for Bluescope house framing.


15 years warranty colorbondAlso other manufacturer’s warranties apply such as up to 15 years for Colorbond sheeting.

About

about us By applying the knowledge of over thirty years in the building and steel building supply and manufacturing industry we can offer you a quality product to suit your wishes. Further the Enduroframe system reflects the culmination of over twenty years research and development by Bluescope.

We can offer houses built with Bluescope Truecore steel to give years of maintenance free happiness.

Your building can be delivered anywhere in Australia or overseas.
All designs are engineer certified and approved. We can also supply a BERS certificate for thermal efficiency.

Our in house draftsman can custom design plans to suit your specifications.
These buildings will not warp, twist or rust nor be eaten by termites.
Bluescope Product Warranties of up to 50 years apply to the steel frames.


Proudly Australian


Modular Steel Kit Homes is an Australian business based in Brisbane, Queensland Australia.

Built to Last


Our Modular Homes are made with high quality materials.

Cost Effective


Building your new home or next project with Modular Steel Kit Homes is cost effective and all buildings are Ultrasafe certified.

 

Important Information

* Before ordering your building, ensure you lodge with your local authority the necessary Building Approval application.

* Please allow a minimum of 30 working days for manufacturing and delivery.

* Your building will be supplied as a complete kit. A comprehensive, step by step instruction manual is included along with colour coded screws and fittings. Any costs associated with site specific requirements are the responsibility of the land owner. The price does not include erection.

* Standard powdercoat window frame colours include - Primrose, White, Black, Beige, Silver, Deep Ocean.

* Insulation available includes - air bubble wrap type, or 50 mm blanket with bonded foil - suitable for under roof, walls , ceilings or under flooring if on raised floor.

* Steel floor system includes - steel bearers, steel joists, and steel RHS columns into 900 deep footings to suit nominal 600 mm above ground. If natural ground levels fall away, columns can be supplied longer to suit - at extra costs.

* All pricing ex South east Queensland - some variation may occur with interstate suppliers and materials prices. All prices ex factory - delivery fees for building materials to site apply - crane truck required to deliver wall frames and trusses.

(Please note that the colours shown are an indication of the colours available. All products advertised are subject to availability. Products may vary from images shown and any delivery charges are additional and will be advised)

Items Not included

* Any site works or builder costs or site building costs which a builder will need to quote - such as Site power pole and connection, site toilet, site fencing and more

* Any internal fit out materials, any plumbing or electrical materials, external access doors other than glass where stipulated

* Flooring such as Yellow tongue or timber decking on raised verandahs - or special fixing screws. Also not included - any stairs or balustrades to internal floors

* Soils test and slab design or footings by an engineer

* Council submission or costs for certifier or to submit to council or site inspections

 


Steel Shed

Looking to buy a shed?

"we sell any type of skillion or gable carport to suit your needs or a shed or barn to suit whatever you would like. We are happy to quote for your project.
Visit Shed Alliance to find out more...